Saudi Aramco - Khuff Gas project
In March 2005 a contract was awarded by Saudi Aramco to Suedrohrbau Saudi Arabia Ltd. for the provision of installation and construction works on several of Aramco's wellsites, flowlines, trunklines, headers, manifolds, transfer lines and other pipelines, on an as-required and call-off basis within this framework contract.
These construction works can be called in for execution at various locations in the Khuff Gas Project area.
The contract lasts for a period of 5 years, and in the meantime 4 service orders for various demolition- and tie-in works have been assigned already, totaling some US$ 3 million.
Suedrohrbau Saudi Arabia Ltd. has an excellent history in contracting and carrying out Unit Rate contracts. Already since 1999 we are active in the Southern area with these type of contracts, much to the satisfaction of our clients.
|
|
|