Saudi Aramco - SHY 1 phase II
Country of project execution Start date End data Distance Name of Ultimate Client |
 : Saudi Arabia : September 2007 : January 2010 : 585 km : Saudi Aramco |
 |
Nacap / Suedrohrbau was recently awarded Phase II of the SHY-1 Expansion Project. The contract signing ceremony took place on 2 September 2007.
The scope of work comprises the engineering, procurement, construction and installation of three pipeline loops and tie-ins to the existing East/West NGL pipeline as follows:
- Loop 1, SGP to KM 958 - DN750 (30"). X 206km long
- Loop 2, PS # 8 to KM 220 - DN750 (30"). X 308 km long
- Loop 3, KM 65 to YGP - DN750 (30"). X 71 km long
|
The scope of work also includes all associated works such as scraper traps, mainline valves, cathodic protection, communication and installation of two major pumps, air-compressors, leak detection system for the whole pipeline (old and new).
Nacap / Suedrohrbau is already mobilized on this project with the detailed engineering design work and procurement well in progress and the project is slated for completion towards January 2010. |
 |
|
|
|